華星東方公司承建的吉林省長春市農安生活垃圾焚燒發電項目煙氣凈化工程于2021年09月28日開工建設。
The flue gas cleaning project of the Nong'an domestic waste incineration power generation project in Changchun City, Jilin Province, undertaken by our company, started construction on September 18, 2021.
該項目總設計規模日焚燒處理生活垃圾1600噸/日,分二期建設,一期設計處理規模800噸/日,配置2臺400t/d爐排型垃圾焚燒爐,年處理規模29.2萬噸,二期項目處理規模800噸/日。煙氣處理采用“半干法(旋轉噴霧反應塔)+干法(噴射氫氧化鈣)+活性炭噴射+布袋除塵器+飛灰輸送”的煙氣凈化工藝,為我司EPC工程。
The project has a total designed daily incineration capacity of 1,600 tons of domestic waste per day. It will be constructed in two phases. The first phase has a designed processing capacity of 800 tons per day. It is equipped with two 400t/d grate-type waste incinerators and has an annual processing capacity of 292,000 tons. The processing capacity of the second phase project is 800 tons/day. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotating spray reaction tower) + dry method (injection of calcium hydroxide) + activated carbon injection + bag dust collector + fly ash transportation", which is our EPC project.
華星東方在吉林省的業績涵蓋包括:吉林、吉林舒蘭、通化梅河口、長春農安、長春德惠、長春一期、二期、三期、松原等多個項目。
Jiangsu Huaxing East’s performance in Jilin Province includes multiple projects such as Jilin, Jilin Shulan, Tonghua Meihekou, Changchun Nong'an, Dehui, ChangchunChangchun phase I, II, and III,Songyuan, etc.
評論